The planning and technology of the route material takes through a plant – from delivery through processing to despatch. Handling devices are the nodes of that flow: they take over wherever material is transferred, turned or handed on.

Also
Material flow · Conveying technology · Internal transport technology
Also known as
  • Material flow
  • Conveying technology
  • Internal transport technology
01

The route of the material

Material flow is the chain of all operations a material passes through within a plant: processing, inspecting, handling, conveying, storing – and waiting. Material flow technology plans that chain and provides the means for it.

The perspective is that of the material. The question is not what a machine can do but how a part gets from delivery to despatch, how often it is touched on the way and how long it lies idle.

02

How a material flow is analysed

The analysis starts with a survey: what quantities move between which stations? This is recorded in a from-to matrix and visualised in a Sankey diagram, in which the width of each arrow corresponds to the quantity.

It shows where routes cross, where material runs back and where it is transferred frequently. Every transfer is a handling operation – and every handling operation costs time, carries a risk of damage and, if done by hand, is a physical strain.

03

The nodes are the lifting stations

In material flow planning, routes and stations are in the foreground. The transitions between them – from container to machine, from belt to pallet – appear in the layout as a dot. On the shop floor they are the workstations where lifting takes place.

  • Record for each node: weight, dimensions, frequency, pick-up and set-down height.
  • Check whether the operation can be eliminated – the best transfer is the one that does not happen.
  • Classify the remaining operations: acceptable by hand, with a hand-guided device, automatic.
  • Reserve floor space and headroom for the device in the layout before racks and machines are in place.
04

Plan early what is hard to change later

A hoist needs a supporting structure: a column with a foundation, a wall bracket or a rail system on the ceiling or on posts. Whether ceiling or floor can take the loads, whether the headroom is sufficient and whether a crane, a light fitting or a sprinkler pipe is in the way is cheapest to settle at the layout stage.

The typical mistake is the reverse order: the line is installed first, then it turns out that the lifting at three stations is too heavy – and the space for the device is missing.

What Entracon offers here is on the matching page.

See what we offer
Frequently asked questions

Frequently asked questions about Material flow technology

What is the difference between material flow technology and conveyor technology?

Conveyor technology is the means of transport – belt, roller conveyor, crane. Material flow technology is the planning of the whole route including storage, handling and waiting. Conveyors are one tool of material flow technology.

And how does it differ from intralogistics?

The terms overlap. Material flow technology comes from factory planning and looks at the physical route of material through production. Intralogistics explicitly includes warehouse management, order control and information flow.

When do lifting aids belong in material flow planning?

From the start. The supporting structure, headroom and working area of a device influence the layout. Planning them only after commissioning means making do with whatever columns, racks and machines leave free.

Where the term appears on this site

From the term to the application

Contact

Let's talk about your project.

One short conversation usually settles more than three quotations. Call or write — you will reach an engineer directly.

Reach Entracon

How can we help?

Send an e-mail info@entracon.de
Or call us directly +49 234 5414010