Headroom
The space a hoist occupies above the load and which is therefore lost to the stroke. In existing halls headroom is often the real constraint: sometimes only centimetres remain between the underside of the truss and the highest part position. Low-headroom lift axes and short-stroke units are the answer where a chain hoist with a hook no longer fits.
- Also
- Height above the load · Head dimension · Bauhöhe
- Height above the load
- Head dimension
- Bauhöhe
What Entracon offers here is on the matching page.
See what we offerLet's talk about your project.
One short conversation usually settles more than three quotations. Call or write — you will reach an engineer directly.