The eight items
They rarely appear in a specification and can be gathered at the workstation in ten minutes. Sending them along gets you a quotation instead of a round of queries – usually within a few days.
- Part: what exactly is handled, with dimensions and material
- Weight: the heaviest part, including an estimated gripper weight
- Movement: lifting, guiding, placing in a fixture, turning or joining
- Route: from where to where, with obstacles in between
- Frequency: operations per shift and shift pattern
- Accuracy: place freely, into a seat or against a stop
- Environment: clear height, floor build-up, zone, cleanliness requirement
- Services: available compressed air, power, space for a column