Glossary

Pillar jib crane

A floor-anchored pillar with a slewing jib serving a circular working area. The design is simple, inexpensive and quickly erected – but it needs a load-bearing foundation, because the whole tipping moment from load and outreach passes through the base into the floor. Where several stations are to be served as one area, a rail system is usually more economical.

Also
Pillar slewing crane · Column-mounted jib · Säulenschwenkkran
Also known as
  • Pillar slewing crane
  • Column-mounted jib
  • Säulenschwenkkran
01

Design

A pillar jib crane consists of a pillar anchored to the floor and a jib that slews around it. A trolley with the hoist – chain hoist, wire rope hoist or balancer – runs on the jib. On smaller cranes, slewing and travelling are done by hand as the operator guides the load; larger cranes have electric slewing and travel drives.

The working area is a circle. Every point in it is reached by slewing the jib and moving the trolley.

02

Jib designs

Two basic forms are common. On the overbraced jib a tie rod carries part of the load from above; the design is light and moves easily but needs height above the jib. The cantilever jib manages without bracing and makes better use of the room height, but is heavier.

Depending on the design, the slewing range extends up to a full circle. Where walls, machines or traffic routes are in the way, it is limited by stops.

03

Foundation and anchoring

At the base of the pillar the tipping moment of load times outreach acts, plus the self-weight of jib and hoist. All of it passes through the base plate into the floor. There are two ways to deal with this: fixing with anchors on the existing floor slab, or a dedicated foundation with cast-in anchors.

Fixing on the existing floor presupposes that thickness, grade and reinforcement of the slab are known and have been verified for the moment. An industrial floor that carries forklift traffic is not thereby suitable for the anchor forces of a jib crane. If the documents are missing, a dedicated foundation remains the safe route.

04

Selection criteria

Five items define the crane.

  • Capacity including the load handling attachment.
  • Outreach to the furthest point that actually has to be served.
  • Height under the jib – together with the hoist it determines the usable hook height.
  • Slewing range and obstacles within the slewing circle.
  • Location: indoors or outdoors, where wind and corrosion protection come into play.
05

Limits and alternatives

A pillar jib crane serves one station. If several stations are to be covered as one area, a rail system is usually more economical. If an obstacle stands between pillar and target, a straight jib cannot reach it – an articulating jib is then the right design. And where the floor is to stay clear, a wall-mounted jib crane can be considered.

As a crane it is inspected before first use and periodically thereafter – in Germany under DGUV Vorschrift 52.

What Entracon offers here is on the matching page.

See what we offer
Overview

The pillar jib crane and its alternatives

Type Working area Fixing Fits when
Pillar jib crane Circular area Floor or foundation a single station stands free in the room
Wall-mounted jib crane About a half circle Load-bearing wall or column the floor is to stay clear
Articulating jib Circular area, around obstacles Floor, ceiling or rail obstacles are in the way
Rail system Line or area Roof, columns or gantry several stations are served
Frequently asked questions

Frequently asked questions about Pillar jib crane

Does a pillar jib crane always need a foundation?

Not always. It can be fixed with anchors on the existing floor if the load-bearing capacity of the slab has been verified for the tipping moment. Without that verification a dedicated foundation is required.

How far can a pillar jib crane slew?

Depending on the design, up to a full circle. Some versions are limited to a smaller range by their construction; in addition the slewing range can be restricted by stops.

Does a jib crane have to be inspected?

Yes. It is a crane and is inspected before first use and periodically, in Germany as a rule at least once a year. The anchoring is part of the inspection.

Can a pillar jib crane stand outdoors?

Yes, in a version designed for it. Outdoors, wind loads on jib and load are added, the jib needs a lock against slewing on its own, and hoist and surfaces must be protected against the weather.

Contact

Let's talk about your project.

One short conversation usually settles more than three quotations. Call or write — you will reach an engineer directly.

Reach Entracon

How can we help?

Chat is not staffed right now. We are back for you today from 08:00. Just request a call-back – we'll get back to you.
Send an e-mail info@entracon.de
Or call us directly +49 234 5414010