Glossary

Cycle time

The time available to a work step in a cycled production. It is the sharpest selection criterion for a lifting aid: a device that slows the cycle gets bypassed, however ergonomic it may be. Sizing therefore covers not only the lifting time but also picking up, regripping and returning to the home position.

Also
Takt time · Cycle · Taktzeit
Also known as
  • Takt time
  • Cycle
  • Taktzeit
01

Takt is the target, cycle is the result

Takt time follows from demand: available working time divided by the number of units needed in that time. With 450 minutes of net working time and 300 parts per shift it is 90 seconds. It is a requirement placed on the workstation.

Cycle time is the time the operation actually takes. If it exceeds takt, the line backs up. For handling, what counts is therefore not how fast a unit lifts but whether the whole handling operation fits into the share that takt leaves for it.

02

Breaking down the handling cycle

A cycle consists of more than lifting and lowering. Comparing lifting speeds alone compares the smallest item.

  • Guide the gripper to the part and align it
  • Grip and wait for confirmation – vacuum build-up, clamping stroke
  • Lift and move clear
  • Travel to the set-down point, rotating or tilting where needed
  • Position and set down – the step with the greatest variation
  • Release and return to the next pick-up
03

Where the seconds really are

The large shares are almost always gripping and positioning. A gripper that centres itself on the part saves more than a faster hoist. A balancer on which the load floats and is guided by hand positions faster than a hoist that has to be inched into place with push buttons.

The return counts as well. A heavy gripper makes every empty run slow; a unit that returns to its home position by itself takes a step off the operator.

04

The benchmark is lifting by hand

A lifting aid does not compete with another lifting aid but with handling the part without one. If it is noticeably slower, it will be bypassed as soon as takt presses – and the investment in ergonomics has no effect.

The enquiry should therefore state the takt time, the share available for handling and the number of lifts per shift. The number of lifts also determines the loading of the unit and thus its classification.

What Entracon offers here is on the matching page.

See what we offer
Overview

Cycle elements and their levers

Step What lengthens it What shortens it
Gripping Aligning by hand, slow vacuum build-up Self-centring gripper, adequately sized vacuum generator
Lifting and travelling Low lifting speed, heavy jib Floating guidance, light structure
Positioning Inching with push buttons Sensitive guidance by hand, end stops
Return Heavy gripper, long travel Light gripper, pick-up close to set-down
Frequently asked questions

Frequently asked questions about Cycle time

What is the difference between takt time and cycle time?

Takt time is the target derived from demand: available time divided by the number of units required. Cycle time is the measured duration of the operation. The cycle has to fit within takt.

Below which takt time is a lifting aid no longer worthwhile?

There is no fixed limit. With very short takt times and light parts a hand-guided unit is often too slow; a different workstation layout or automation should then be examined. A time study at the actual workstation decides.

What does the manufacturer need to know about takt?

Takt time, the share of time available for handling, lifts per shift, distances between pick-up and set-down and the accuracy required when setting down.

Contact

Let's talk about your project.

One short conversation usually settles more than three quotations. Call or write — you will reach an engineer directly.

Reach Entracon

How can we help?

Chat is not staffed right now. We are back for you tomorrow from 08:00. Just request a call-back – we'll get back to you.
Send an e-mail info@entracon.de
Or call us directly +49 234 5414010