Glossary

Theoretical service life

The calculated operating life of a serial hoist up to a general overhaul, determined under FEM 9.755 from operating hours and load spectrum. Once reached, the unit is not used up – it has to be overhauled and the counter reset: strip the hoist, replace wear parts, overhaul brake and gearbox, load test, documentation. The same unit then runs another cycle at a fraction of the cost of a new one.

Also
FEM 9.755 · General overhaul · S.W.P.
Also known as
  • FEM 9.755
  • General overhaul
  • S.W.P.
01

A hoist has a calculated end

Serial hoists are not built for unlimited running time but for a certain number of operating hours at a certain loading. This design basis is expressed by the mechanism group under FEM 9.511 – 1Bm, 1Am, 2m, 3m, 4m. Each group has a theoretical service life D in full-load hours.

FEM 9.755 describes how the operator tracks the portion used up. As long as actual use stays below the theoretical figure, the hoist is working within its safe working period, S.W.P. for short. Once it is reached, a general overhaul is due.

02

The calculation: running time times load spectrum

Actual use S results from the running time of the hoist T and the load spectrum factor km: S = km · T. The factor rates how heavily the hoist was loaded on average. FEM distinguishes four spectra: light with km = 0.125, medium with 0.25, heavy with 0.5 and very heavy with 1.0.

A hoist that mostly runs with small partial loads therefore uses up its service life eight times more slowly than one constantly lifting its rated load. If running time and loads are estimated rather than measured, FEM 9.755 provides for a factor that covers the uncertainty of the recording method; the value is given in the operating manual.

03

An example with assumed figures

A chain hoist in mechanism group 2m has a theoretical service life of 1600 full-load hours. Assume the hoist runs for one and a half hours on 220 working days, i.e. 330 hours a year, with a medium load spectrum. Annual use is then 0.25 · 330 = 82.5 full-load hours.

Without the recording factor, the service life would be reached after a good 19 years. With a heavy spectrum and the same running time, that period halves; in two-shift operation it halves again. What counts is always the running time of the hoist motor, not the length of the shift.

04

How the values are recorded

Most accurate is a data logger in the hoist that records running time and load itself. The next best solution is an operating hours counter combined with a reasoned assessment of the load spectrum. Without a counter, both quantities can only be estimated from the work process – with the largest factor.

The portion used up is determined and documented at the periodic inspection, as a rule once a year. If there are no records at all, a remaining service life cannot be demonstrated.

05

What happens when it is reached

Once the theoretical service life is used up, the hoist may only continue in service after a general overhaul. The fatigue-loaded parts of gearbox, brake and chain or rope drive are checked and replaced as specified by the manufacturer. A new safe working period then begins, its length set by whoever carries out the overhaul.

What Entracon offers here is on the matching page.

See what we offer
Overview

Theoretical service life D by mechanism group

Mechanism group D in full-load hours Running time at medium spectrum (D ÷ 0.25)
1Bm 400 h 1,600 h
1Am 800 h 3,200 h
2m 1,600 h 6,400 h
3m 3,200 h 12,800 h
4m 6,300 h 25,200 h
Frequently asked questions

Frequently asked questions about Theoretical service life

Is a hoist scrap once its theoretical service life has expired?

No. It has to be given a general overhaul. After that it runs for another working period. Whether the overhaul is worthwhile compared with a new unit depends on condition, age and spare parts supply.

Does the theoretical service life also apply to manual hoists?

FEM 9.755 refers to power-driven serial hoists. Manually operated equipment is assessed by condition.

Which running time counts – that of the installation or of the hoist?

The time during which the hoist is actually lifting or lowering. It is usually only a small part of the shift. An operating hours counter on the hoist motor records exactly this value.

How do I find the mechanism group of my hoist?

It is stated on the rating plate and in the operating manual, as an FEM designation such as 2m or as an ISO designation such as M5.

Where the term appears on this site

From the term to the application

Contact

Let's talk about your project.

One short conversation usually settles more than three quotations. Call or write — you will reach an engineer directly.

Reach Entracon

How can we help?

Chat is not staffed right now. We are back for you on Monday from 08:00. Just request a call-back – we'll get back to you.
Send an e-mail info@entracon.de
Or call us directly +49 234 5414010