Glossary

Heavy load handling

Handling of loads above the range covered by hand-guided standard units. Honest demarcation matters here: above roughly 125 kilograms either a special design or a crane with a suitable lifting device is the right answer – a manipulator is not a crane substitute.

Also
Heavy-duty handling · Heavy-load manipulator
Also known as
  • Heavy-duty handling
  • Heavy-load manipulator
01

Where “heavy” begins

Heavy-load handling is not a standardised term with a fixed limit. It means handling loads beyond the range of hand-guided standard devices. Where that range ends depends on design and reach and is stated in the data sheet of the device concerned.

What decides is not weight alone but the load moment: load times distance from the axis of rotation. The same load that is guided without difficulty close to the column overloads the device at full reach.

02

The three routes

There are three answers for heavy loads. The first is the crane – overhead travelling crane, slewing jib crane or gantry crane – with a lifting attachment that suits the load: lifting beam, tongs, C-hook, magnet, vacuum lifter. It lifts and travels but positions only as accurately as the swinging load allows.

The second is the special device: a manipulator designed for one particular heavy load and one particular movement – turning or joining, for instance. The third is floor-based equipment, from the lift table and heavy-duty trolley to the assembly trolley with lifting and tilting functions.

03

What grows with the weight

With the load, the forces that the building has to take grow too. A column needs a foundation that carries the overturning moment; a rail system on the ceiling needs proof that the ceiling can take the loads.

  • Structure and foundation are verified by calculation for load, dead weight and reach – not estimated.
  • Inertia increases: a heavy load can no longer be stopped abruptly by hand; a drive takes over acceleration and braking.
  • Lifting attachments have to be marked as such and inspected periodically.
  • Standing under a suspended load must be ruled out; the procedure belongs in the risk assessment.
04

A manipulator is not a crane substitute

The hand-guided manipulator is built for guiding and positioning, within a limited working area and up to its rated capacity. The crane is built for lifting and travelling, across the whole bay and for large loads. The tasks overlap only in a narrow band.

The typical mistake is wanting one device to do both. Often the better solution is the combination: the crane brings the load to the station, and a suitable lifting attachment with a rotating or turning function does the fine work.

What Entracon offers here is on the matching page.

See what we offer
Overview

Three routes for heavy loads

Route Strength Limit
Crane with lifting attachment large loads, large working area load swings, positioning takes experience
Special manipulator guided turning and joining of heavy parts designed for one task, fixed working area
Floor-based equipment no structure on ceiling or column needed needs clear, level floor and standing space
Frequently asked questions

Frequently asked questions about Heavy load handling

Up to what weight does a hand-guided manipulator work?

That depends on design and reach and is stated in the data sheet of the device; the rated capacity includes the gripper. Above that, special designs or a crane with a lifting attachment are the right answer.

Can a heavy load be positioned precisely on a crane?

To a limited extent. A hoist with a precision lifting speed, an attachment that holds the load level and rotatable, and guides or locating features at the destination all help. Where joining to the millimetre is required, a guided kinematic system is the safe solution.

Who checks whether the building can take the loads?

A structural engineer, using the load data from the equipment manufacturer. The manufacturer states the forces and moments at the connection point; whether floor, column or ceiling can carry them is a structural verification for the building.

Where the term appears on this site

From the term to the application

Contact

Let's talk about your project.

One short conversation usually settles more than three quotations. Call or write — you will reach an engineer directly.

Reach Entracon

How can we help?

Send an e-mail info@entracon.de
Or call us directly +49 234 5414010