Most enquiries begin with a weight: “we have to lift 40 kilograms, what do you recommend?” No unit can be derived from that alone. What matters is what happens to the load once it is up – and whether picking it up takes longer than lifting it by hand.

Author
Dr.-Ing. Philipp Schwittek
Reading time
9 minutes
Updated
05. September 2026
The key points
  • The movement determines the type, not the weight: lifting, guiding, joining or turning.
  • Five facts are enough for a sound shortlist – weight including the pick-up, route, frequency, placing accuracy, environment.
  • The load pick-up is where projects fail, not the unit.
  • A unit whose pick-up takes longer than lifting by hand stops being used after a few weeks.
  • An assessment under the key indicator method is the factual basis – and usually the most convincing argument.
01

Five facts that carry a decision

A sound shortlist needs neither a drawing nor a specification, just five facts. They can be gathered at the workstation in ten minutes – and they say more than any product description.

  • Weight of the load including the gripper, not the part alone
  • The route: from where to where, with what obstacles in between
  • Frequency per shift – one lift a day is judged differently from four hundred
  • Placing accuracy: set down freely, place in a fixture or join against a stop
  • Environment: space above the load, floor, zone, cleanliness requirements
02

The movement determines the type

If the load is only lifted, carried and set down, a rope balancer is the lightest and fastest answer. If it is positioned – into a fixture, against a stop, onto a mandrel – a rigid arm is needed that absorbs lateral forces. If torque is involved, from a nutrunner for instance, a torque arm is the right answer and not a lifting device. This mapping is remarkably reliable: more than nine out of ten workstations can be classified correctly in advance with it.

03

Why the pick-up decides success

A handling device gets used when it is faster than the hand – and left standing when it is slower. The time almost never sits in the lifting but in coupling to the load. A gripper needing two movements and a glance is within the cycle; one that has to be aligned, locked and checked is not. That is why we define the pick-up first and the unit second – not the other way round, as the catalogue suggests.

04

What else has to be settled at the station

There has to be space above the load: a balancer needs headroom, an articulated arm needs slewing space, a rail system needs a load-bearing roof or its own stanchions. The floor has to take the anchor forces – we calculate that before quoting, because a foundation discovered later upends any costing. And the station has to stay accessible: where a unit blocks the way to the material trolley, it gets bypassed.

05

The case: assessment instead of gut feeling

German load handling regulations name no limit value but require an assessment. The key indicator method rates load weight, posture, execution conditions and time share together. That is exactly the language in which an investment can be justified: not “this is heavy” but “the risk score is in the red band, and these three criteria change with the unit”. We record it as part of the workstation analysis – it costs half a day and often decides the approval.

Overview

From movement to type

Task at the station Suitable type Why
Lift, carry, set down freely Rope balancer Long lift, low headroom, fastest pick-up
Place into a fixture Articulated-arm manipulator Guides the load on a path, holds it when released
Join against a stop Articulated-arm manipulator Absorbs lateral force and tilting moment
Reach into a deep container Articulated arm with rope Long reach combined with long lift
Screwdriving Torque arm Absorbs the reaction moment, not the weight
Work across a whole area Rail system Reaches every point without slewing space
Frequently asked questions

Frequently asked questions about Lifting aids at the assembly station

From what weight does an assembly station need a lifting aid?

There is no statutory limit – the regulation requires an assessment. In practice: from 15 to 20 kg with frequent repetition, from 25 kg for single lifts, and always where two people lift, where work happens above shoulder height or where reaching means deep trunk flexion.

How long does it take from enquiry to a finished station?

For a standard unit with an adapted pick-up, six to ten weeks is realistic. The longer part is rarely the unit but the load pick-up: it is almost always a special design and needs a drawing, manufacture and a trial run.

What does a lifting aid cost?

The range is wide because the pick-up counts. A balancer with a simple mount sits in the low four figures, an articulated-arm manipulator with a special gripper in the mid five figures. A sound figure only emerges after the workstation survey – before that any number is a guess.

Can we keep using an existing unit?

Often yes. Where a unit is not accepted, the cause is usually the pick-up, not the unit. A new gripper and a changed layout solve more cases in our experience than a new purchase – and we say so even where a new unit would be the better business for us.

About the author

Dr.-Ing. Philipp Schwittek

Managing Director, Entracon Planungsgesellschaft mbH

Engineer with a doctorate, specialising in plant engineering, digital design and process automation – from simulation through to commissioning.

  • Sizing
  • Design
  • Plant engineering
  • Standards and safety
Contact

Still a question open?

A short conversation usually settles more than three quotations. You reach an engineer directly, not a queue.